Two maintenance crews in high-vis beside service utes on a mine site road while a supervisor checks a tablet
    Job Management · Crews and Sites

    How to Allocate Jobs Across Multiple Crews and Sites

    A practical eight-step process for supervisors and schedulers juggling crews, competencies, equipment and travel across sites and the workshop.

    1 October 2026
    11 min read

    Knowing how to allocate jobs gets much harder once you have multiple crews working across different sites. It is no longer a matter of handing the next job to the next available worker. You need to weigh availability, location, competencies, priority, equipment and the knock-on effect each new job has on the rest of the day.

    Quick Answer

    A good job allocation process matches each job with the right crew, resources and time based on priority, location, availability and capability, while keeping visibility across the entire workload. In practice: list all jobs, prioritise, define requirements, check real availability, match the best-fit crew, confirm equipment, communicate clearly and reallocate as things change.

    Why does job allocation become difficult across multiple crews and sites?

    Every extra crew and site multiplies the number of possible combinations, and one change can ripple through the whole day. The most common failure points in field operations are:

    • Crews booked on overlapping jobs
    • People sent too far from where they are working
    • Urgent work blowing up the existing plan
    • Key competencies held by only one or two crews
    • The same equipment promised to two jobs
    • Workshop and field teams working from different information
    • Allocation run through phone calls and group messages
    • No central view of total workload
    • Travel time left out of the plan
    • Jobs assigned without thinking about what they push back

    What should you consider before allocating a job?

    Before assigning a job, check these eleven factors. Most bad allocations come from skipping one of them.

    FactorQuestion to ask
    Job priorityHow urgent is the work?
    LocationWhere is the job and which crews are nearby?
    AvailabilityWhich employees and crews are actually free?
    Skills and competenciesWho holds the required licences, qualifications or site competencies?
    WorkloadWhich team has capacity without creating delays elsewhere?
    EquipmentWhat vehicles, tools or assets are required?
    Travel timeHow long will it take the crew to reach site?
    Job durationHow long is the work expected to take?
    Roster or shiftDoes it fit inside the worker's shift, roster and fatigue limits?
    Site requirementsInductions, access windows, permits or restrictions?
    DependenciesDoes another task need to finish first?

    How to allocate jobs across multiple crews and sites

    To allocate jobs across multiple crews and sites, work through these eight steps in order, then repeat steps 4 to 8 whenever something changes.

    1

    Step 1: Create a complete list of open and upcoming jobs

    Start with the whole workload, not the next job that lands in your inbox. Allocating one job at a time is how crews end up double-booked and urgent work gets missed.

    • Open jobs
    • Planned jobs
    • Urgent work
    • Workshop work
    • Recurring work
    • Scheduled maintenance
    2

    Step 2: Prioritise the work

    A simple order is usually enough. Most contractors rank work roughly like this:

    • Safety issues
    • Breakdowns
    • Production impact
    • Compliance deadlines
    • Customer commitments and due dates
    • Planned maintenance
    3

    Step 3: Identify the requirements of each job

    Write down what the job actually needs before thinking about who does it.

    • Competencies and tickets
    • Crew size
    • Equipment
    • Vehicle
    • Location
    • Expected duration
    • Site access requirements
    4

    Step 4: Check crew availability and workload

    “Available” should mean more than rostered on. A crew that is rostered on but two hours from site and finishing a job that is running late is not available for a 10am start.

    • Current jobs and expected finish times
    • Travel between jobs
    • Overtime already worked
    • Upcoming commitments later in the shift or swing
    5

    Step 5: Match the job to the best-fit crew

    The closest crew is not always the best crew. Weigh skills, location, current workload, equipment on hand, urgency and whether the same crew can pick up follow-on work at that site.

    6

    Step 6: Confirm equipment and resources

    Allocate the service truck, tooling, parts and hire gear with the people. A crew on site without the right gear is a wasted trip.

    7

    Step 7: Communicate the allocation clearly

    The crew should receive everything they need without ringing the office:

    • Job details and scope
    • Site and location
    • Priority
    • Customer or site contact
    • Documentation and drawings
    • Safety requirements and permits
    • Equipment information
    8

    Step 8: Monitor progress and reallocate when things change

    Allocation is never finished at 7am. Expect to reallocate when:

    • A breakdown comes in
    • A job runs longer than expected
    • Someone becomes unavailable
    • Equipment fails
    • Priorities change
    • New urgent work arrives

    Step 4 is where FIFO and DIDO rosters matter most. If you need to check where swings fall, the FIFO roster calculator shows on and off days for common patterns, and tickets can be checked against a training matrix.

    Example: allocating five jobs across three crews

    This fictional scenario shows the decision-making, not a rule. A mining contractor has three crews across two mine sites and a workshop.

    CrewLocationSkillsAvailability
    Crew ASite 1MechanicalAvailable from 11am
    Crew BSite 2ElectricalBooked until 3pm
    Crew CWorkshopMixed maintenanceAvailable now

    1. Urgent breakdown, Site 1

    Crew C now, Crew A from 11am

    Crew A is already on Site 1 with the right skills but not free until 11am. Crew C heads out immediately to make safe and start diagnosis, then Crew A takes over when free.

    2. Planned service, Site 2

    Crew B

    Already on Site 2. Fits after their current booking finishes at 3pm, as long as the service window allows it.

    3. Workshop repair

    Crew C (later)

    Returns to the workshop once Crew A takes over the breakdown. Not urgent, so it can wait.

    4. Inspection, Site 1

    Crew A

    Same site as the breakdown. Crew A completes it after the breakdown, saving a separate trip.

    5. Non-urgent maintenance, Site 2

    Crew B (next day)

    Low priority. Moved to Crew B's next shift rather than overloading today.

    Different site rules, competencies or client commitments could lead to a different answer. The point is that every allocation was made with the full workload in view, not one job at a time.

    How do you handle urgent jobs without disrupting every crew?

    Treat urgent work as a trigger to reassess the whole workload, not as one more job added on top. In practice:

    • Identify what can move. Find planned work that has slack before touching anything else.
    • Protect genuinely high-priority work. Do not bump a compliance inspection to fix a nice-to-have.
    • Check nearby crews first. A crew already on that site saves hours of travel.
    • Reallocate rather than pile on. Move lower-priority jobs off the crew taking the urgent job.
    • Communicate changes immediately to the affected crews and customers.
    • Update the central schedule so everyone works from the same picture.

    How should crews be allocated across different locations?

    Allocate by location by keeping crews clustered on one site or area for as long as possible, and only moving them when skills or priority demand it. Consider:

    • Travel time between sites, which is unproductive and often billable only in part.
    • Geographic clustering, grouping jobs in the same area for the same crew.
    • Site access, including inductions, gate times and escort requirements.
    • Fatigue and shift length, especially when long drives sit on top of a 12-hour shift.
    • Equipment location, so gear does not need to be moved separately.
    • The next scheduled job, so the crew finishes near where they start next.

    Sending your strongest crew to every hard job feels safe, but it creates long drives, overtime for that crew and idle time for others. For the timing side of multi-site work, see how to schedule field crews across multiple mining sites.

    How do you balance workloads between crews?

    Balance workloads on effort, not job count. Five quick inspections are not the same load as one shutdown task. Useful indicators are:

    • Number of open jobs
    • Estimated hours
    • Travel time
    • Job complexity
    • Current utilisation
    • Overtime already worked
    • Upcoming deadlines

    What happens when job allocation is managed manually?

    Many contractors allocate work with spreadsheets, whiteboards, phone calls, text messages, group chats and paper job sheets. With two crews and one site that can work well. As crews, jobs and sites grow, the same methods start to cause:

    • Outdated information on the board
    • Duplicated work
    • Unclear job ownership
    • Missed changes
    • Inconsistent communication between supervisors
    • Poor visibility across sites

    When should job allocation be managed in software?

    A business may benefit from managing allocation in software when:

    • Several crews are active at once
    • Work is spread across multiple sites
    • Jobs change frequently during the day
    • Employees hold different competencies
    • Equipment must be allocated with labour
    • Supervisors spend hours coordinating by phone
    • There is no reliable live view of job ownership
    • Urgent work regularly disrupts planned work

    Learn more about how job allocation software works, including how allocation differs from scheduling.

    How SprintSuite can help manage job allocation across crews and sites

    SprintSuite keeps jobs, crews and field work in one connected system. Jobs live in job management, are planned against rosters and sites in planning and scheduling, and reach crews on the mobile field app. Workshop jobs sit alongside field work in workshop management, so both teams see the same workload.

    Time recorded against each job flows into timesheets and payroll, costs build up against the job, and completed work can be invoiced through quoting and invoicing. For the full platform view, see mining contractor software.

    Manage jobs, crews and field operations in one connected workflow.

    See your own crews, sites and rosters in a 30-minute walkthrough.

    Allocating jobs across crews and sites: FAQs

    The crew and job scenario is a fictional example for illustration.