Quick Answer
Perth mining contractors don't run one system — they run a stack. Typically:
- Accounting / ERP: Xero and MYOB for smaller contractors; Pronto, Acumatica, Microsoft Dynamics 365 Business Central, SAP and legacy MYOB EXO/Greentree in mid-market and larger businesses
- WHS and contractor compliance portals: client-mandated systems such as Avetta, Rapid Global, Pegasus/Onsite Track Easy, Damstra and Cm3
- Maintenance and asset management: Pronto Xi, Mex, Fiix, Limble, Assetivity-configured CMMS, or the client's SAP PM / IBM Maximo on site
- Scheduling and project controls: Microsoft Project, Primavera P6 for shutdowns, Excel for almost everything else
- Field capture: mobile forms and timesheet apps — SprintSuite, Assignar, simPRO, Connecteam, Deputy, Damstra Workforce
- The real pattern: most Perth contractors run 4-8 disconnected tools plus spreadsheets, and lose margin in the joins between them
What software do Perth mining contractors use?
Most Perth mining and mining services contractors run a layered stack rather than one system. At the base sits accounting or ERP — usually Xero or MYOB for businesses under about 50 people, and Pronto Xi, Acumatica, Dynamics 365 Business Central, SAP or a legacy MYOB EXO/Greentree install above that. Around it sit client-mandated compliance portals (Avetta, Rapid Global, Pegasus, Damstra, Cm3), a maintenance system for plant and equipment, Primavera P6 or Microsoft Project for shutdown planning, a timesheet or workforce app, and SharePoint or Google Drive for documents. Excel fills every gap in between.
Why the stack ends up fragmented
Perth contractors don't choose fragmentation — it accumulates. The accounting system arrives first because the business has to invoice. Then a tier-1 client mandates a compliance portal, so that gets bolted on. A safety incident drives a forms app. Growth from two crews to twelve breaks the whiteboard, so a scheduling tool appears. Each decision was rational; the end state is four to eight systems that don't share a job number, and a supervisor re-typing the same hours three times.
The compliance software you don't get to choose
If you work on WA mine sites you will be pushed into your clients' contractor management platforms. Rio Tinto, BHP, Fortescue, Roy Hill, Newmont and Northern Star and the tier-1s beneath them use systems such as Avetta, Rapid Global, Pegasus/Onsite Track Easy, Damstra and Cm3 for prequalification, inductions, competency verification and site access. These are the client's system of record, not yours — you still need your own source of truth for tickets, medicals, inductions and plant records so you can populate five portals from one dataset instead of maintaining five parallel spreadsheets.
Maintenance and asset software
Contractors doing mobile maintenance, workshop or fixed-plant work typically run a CMMS: Mex is common in Australian resources, alongside Pronto Xi's maintenance module, Fiix and Limble in newer implementations. On site you will also work inside the client's SAP PM or IBM Maximo work-order flow. The practical challenge is reconciliation: the work order lives in the client's system, the labour hours live in yours, and the invoice has to match both.
Scheduling, shutdowns and project controls
Shutdown and turnaround work in the Pilbara and Goldfields is planned in Primavera P6 by the client or the tier-1 planner, with contractors receiving a work-pack and a window. Contractors themselves usually plan in Microsoft Project or Excel, then allocate crews on a whiteboard or in a scheduling app. The failure point is the last mile — the schedule is accurate on Monday and stale by Wednesday because the change lives in someone's phone rather than the system the crews see.
Payroll, awards and EBA interpretation
This is where Perth contractors most often outgrow generic tools. FIFO rosters, site allowances, travel, LAFHA arrangements, EBA overtime rules and the Mining Industry Award 2020 or Black Coal Mining Industry Award 2020 quickly exceed what a basic timesheet app can interpret. Manual pay adjustments are a strong signal that the timesheet layer needs to capture the conditions at the source rather than at the payroll run.
The gap nobody buys software for
Ask a Perth contractor where they lose money and it is rarely one system. It is the joins: hours captured on paper and re-keyed, variations agreed verbally and never invoiced, plant hire running past the job, competencies expiring unnoticed until site access is refused, and a job's true cost only visible after the month-end close. Those losses live between tools, which is why consolidating the operational layer — jobs, people, plant, forms, hours and costs — usually returns more than upgrading any single product.
How to choose without over-buying
Start from your commercial pain, not the feature list. Write down the three numbers you can't get quickly today (job margin, unbilled hours, expiring competencies), then test whether a system produces them from data your crews already enter. Insist on offline mobile capture — the Pilbara has coverage gaps — and on an export or API so the compliance portals and your accounting system can be fed from one place. Keep accounting where it is; replace the spreadsheets first.
A note on accuracy
Software choices vary widely by contractor size and client mix, and vendor names change through acquisition. The systems listed here are widely used across Australian mining services as at August 2026 and are described by category rather than endorsed or ranked. Confirm current client-mandated platform requirements directly with each principal contractor before committing to a stack.
The typical Perth mining contractor software stack
| Layer | Commonly used | What it's for |
|---|---|---|
| Accounting / finance | Xero, MYOB Business, MYOB EXO/Greentree (legacy), Pronto Xi, Acumatica, Dynamics 365 BC, SAP | Payroll, invoicing, GST/BAS, statutory reporting |
| Job and project costing | Excel, ERP job modules, purpose-built contractor platforms | Quoted vs actual labour, plant, materials and variations |
| WHS and safety | Avetta, Rapid Global, Cm3, Damstra, Pegasus/Onsite Track Easy, in-house SharePoint | Prequalification, inductions, competencies, incident reporting |
| Maintenance / CMMS | Mex, Pronto Xi Maintenance, Fiix, Limble, client SAP PM or Maximo | Work orders, servicing intervals, plant history |
| Scheduling / planning | Primavera P6, Microsoft Project, Excel Gantt sheets, whiteboards | Shutdown sequencing, crew allocation, resource levelling |
| Time and attendance | Deputy, Connecteam, Damstra Workforce, paper dockets, client site systems | Site hours, allowances, award and EBA interpretation |
| Field forms and mobile | SprintSuite, Assignar, simPRO, Fulcrum, Microsoft Forms, PDFs | Pre-starts, JHAs, take-5s, ITPs, service reports, photos |
| Documents and drawings | SharePoint, Google Drive, Aconex, Procore, Dropbox | Revision control, client transmittals, as-builts |
Compiled from publicly available product information and common practice across Australian mining services in August 2026. Listed by category, not ranked or endorsed. Client-mandated platforms vary by mine owner and contract — confirm requirements directly with each principal.
Fewer systems. One job number.
SprintSuite consolidates the operational layer — jobs, crews, plant, competencies, pre-starts, timesheets and costs — so your Perth office can answer a client audit or an invoice query the same day, without rebuilding it from spreadsheets.
Frequently asked questions
Related reading: Who are the major Perth mining contractors? · How big is the mining industry in Western Australia? · Mining contractor management software · Field service and workshop software in Perth · Shutdown management for mining contractors



